RSS

You are here

Construction of Intermodal terminal in Belgrade

Project carrier: 

Ministry of construction, transport and infrastructure

Directorate for Construction Land and Construction of the City of Belgrade

 

Project title: 

Construction of Intermodal terminal in Belgrade

Investor: 

Ministry of construction, transport and infrastructure, City of Belgrade,  Directorate for Construction Land and Construction of the City of Belgrade

Designer: 

Egis International / City net

The significance of the project: 

The goal of the project is to contribute to the long-term sustainable development of logistics infrastructure and multimodal transport in the Republic of Serbia. This should be achieved through connecting all forms of transport, which increases the possibility of ensuring mobility of cargo, more efficient use of transport means, quality of logistics and related services, increasing the attractiveness and competitiveness of the Republic of Serbia as a transit country, through better use of domestic resources and reducing the costs of cargo transportation, as well ason the environment by heavy freight vehicles.

Status of the project: 

The technical documentation is complete. The financial agreement with the European Commission for IPA 2015, based on financing of the construction of the first modern intermodal terminal in Belgrade (Batajnica), was signed on December 30th, 2016. Funds were provided through IPA 2015 in the amount of 15.54 million euros, of which the national co-financing amounts to 1.76 million euros for works, supervision, equipment and TA for the operator, as well as four million euros for the expropriation process, financed from the budget of the City of Belgrade.

 

Investment value: 

21,3 million euros (including 4 million euros for the expropriation)

 

Start of the project: 

The construction of the Intermodal Terminal is expected to begin in 2019.

Completion of the project: 

End of 2021

Source of finance: 

85%  IPA 2015

15% budget of the Republic of Serbia

4 million euros for the expropriation from the budget of the City of Belgrade

Project description: 

Future intermodal terminal will have a direct connection with Corridor X, i.e. will be connected to the railway station in Batajnica through the service road for Batajnica loop. Intermodal terminal area with access roads is about 13 hectares. Near the intermodal terminal, the development of a logistic center on the surface of 82.5 hectares is planned.

Based on the Preliminary Design, the most important part of the terminal will be a manipulative area, consisting of:


    - 3 tracks: 2 loading and unloading tracks for loading and unloading of the contractor and 1 additional manipulative track for the locomotive (each 650 m long);
    - 4 lanes for truck passage: 1 passing, 1 loading / unloading, 1 spare and 1 emergency exit bar;
    - Plateau for Temporary Disposal of the Container: 3 container lines for temporary disposal of containers, frigo-containers, interchangeable transport vessels and containers with dangerous goods.