RECONSTRUCTION AND MODERNISATION OF THE RAILWAY SECTION SUBOTICA – HORGOŠ – STATE BORDER WITH HUNGARY (SZEGED)
Government of the Republic of Serbia, Ministry of Construction, Transport and Infrastructure
Serbian Railways Infrastructure a.d.
RECONSTRUCTION AND MODERNISATION OF THE RAILWAY SECTION SUBOTICA – HORGOŠ – STATE BORDER WITH HUNGARY (SZEGED)
Serbian Railways Infrastructure a.d.
Negotiations are underway for conclusion of a contract for works on this section with the selected strategic partner, КARIN КOMERC MD DOO VETERNIК and “RZD International” d.o.o, Belgrade Branch.
The Supervisor has not been appointed yet
"CeS COWI" d.o.o
Decision on the National Programme for public railway infrastructure 2017—2021 (The Official Gazette of the Republic of. No. 53/17).
Execution of this Project will help renovate and improve transport connections in the region, particularly connections between two major economic centres, Szeged and Subotica. The objective is to reach the technical level and quality of railway transport in accordance with set requirements for state-of-the-art transportation systems, through reconstruction and modernisation of the railway.
Negotiations are underway for conclusion of a contract for works on this section with the selected strategic partner, КARIN КOMERC MD DOO VETERNIК and “RZD International” d.o.o, Belgrade Branch.
The value of the investment is approximately 87,000,000 EUR (excluding VAT).
Q3 of 2021
Q3 of 2022
Budget of the Republic of Serbia / loan from one of the Serbian banks
The Project is to include reconstruction of a 26.63 km long railway (the length of the railway in the territory of Hungary is 12.6 km, and the total length is 39.23 km) for speeds up to 120 km/h (the substructure will be reconstructed for speeds up to 160 km/h; while the superstructure, together with SS and TT systems and stable electric traction substations, will be reconstructed for speeds up to 120 km/h).