Adaptation of Iron Gate 1 Navigational Lock Project "Djerdap 1"
Investor:
Ministry of construction, transport and infrastructure
Project value:
28,5 million EUR
Financing:
The project is financed partly from the Connecting Europe Facility (CEF) funds - 40%, while the remaining 60% is provided from a financial contract for the development of river transport infrastructure projects with EIB.
Project designer:
Energoproject-Hydroengineering joint-stock company Belgrade
Contractor:
Consortium DSD Gmbh, "Feromont" l.l.c. and "Elektromontaza" l.l.c.
Supervision:
iC consulenten Ziviltechniker GesmbH
Project significance:
The project will considerably increase the functionality of the vessel lock in terms of shortening the time needed for the implementation of the ship's translation operation, which will have positive effects on the overall navigation on the Danube, as well as on the development of industry and economy in the region. The project includes the replacement of electrohydraulic and hydro mechanical equipment, the reconstruction of the control tower, as well as the dredging of the access waterways within the prefixes of this lock.
Status of the project:
Selected contractor needs to prepare the Running Project by August 2019, in order to close the navigational lock in February 2020, for the execution of physical works to begin.
Beginning of the project:
January 2019
End of the project:
March 2021