Design and construction of Metro Line 2
Ministry of Construction, Transport and Infrastructure
Design and construction of Metro Line 2
Government of the Republic of Serbia, Ministry of Construction, Transport, and Infrastructure of the Republic of Serbia (Financier)
The Contractor has not been selected yet.
Republic of Serbia, Government of the Republic of Serbia, Ministry of Construction, Transport, and Infrastructure
- Development Plan for Rail, Road, Water, Air, and Intermodal Transport for the Period 2015–2020General Master Plan for Transport in the Republic of Serbia 2009–2027Agreement on Economic and Technical Cooperation in the Field of Infrastructure between the Government of the Republic of Serbia and the Government of the People's Republic of ChinaThe contracting of the design and construction of Metro Line 2 was planned to be divided into 7 separate contracts:Lot 1 Design and execution of preparatory works for the section Depo Bežanija - John Kennedy (Power China)Lot 1 Design and execution of construction works for the section Depo Bežanija - John Kennedy (Power China)Lot 2 Design and execution of preparatory works for the section John Kennedy - Slavija (Power China)Lot 2 Design and execution of construction works for the section John Kennedy - Slavija (Power China)Lot 3 Design and execution of preparatory works for the section Slavija - Mirijevo (Power China)Lot 3 Design and execution of construction works for the section Slavija - Mirijevo (Power China)Design and execution of transport systems and procurement of rolling stock Depo Bežanija - Slavija (Alstom)Line 1 Phase 2 Design and execution of transport systems and Procurement of rolling stock Slavija - Mirijevo (Alstom) Direct contracting based on an intergovernmental agreement- Direct contracting based on an intergovernmental agreement
The Line 2 metro project consists of the Bežanija Depot and a route 23.9 km long with 24 stations and 15 evacuation and ventilation shafts. The Bežanija Depot will manage Lines 2 and 3 of the Belgrade metro. It will be used for parking and maintenance of the rolling stock for Lines 2 and 3 of the Belgrade metro. Metro Line 2 will link city districts on both the left and right banks of the Sava River, encompassing Bežanija, Zemun, New Belgrade, the city center, Vračar, and Zvezdara.
The value of the investment will be established after negotiations with the future Design & Build contractors.
The Line 2 metro project consists of the Bežanija Depot and a route 23.9 km long with 24 stations and 15 evacuation and ventilation shafts.