Novi Beograd - Surčin
Ministry of Construction, Transport and Infrastructure
Novi Beograd - Surčin
Government of the Republic of Serbia Ministry of Construction, Transport and Infrastructure of the Republic of Serbia (Financier) PE“Roads of Serbia” (Investor)
China Communications Construction Company Ltd.
PE "Roads of Serbia"
Government of the Republic of Serbia, Ministry of Construction, Transport and Infrastructure
China Communications Construction Company Ltd
Corridors of Serbia
Institute of Transportation CIP
- Agreement on Economic and Technical Cooperation in the Field of Infrastructure between the Government of the Republic of Serbia and the Government of the People's Republic of China.
- Memorandum of Understanding and Cooperation within the “Belgrade – Southern Adriatic” Project E-763, Section Novi Beograd – Surčin, between the Government of the Republic of Serbia and China Communications Construction Company Ltd.
- Spatial Plan for the Special-Purpose Area of the Infrastructure Corridor Belgrade – Southern Adriatic, Section Belgrade – Požega
- Commercial Contract for the Design and Construction Works on the Novi Beograd – Surčin Section.
- By the Conclusion of the Government of the Republic of Serbia dated May 21, 2020, the project was designated as a project of special importance for the Republic of Serbia.
- Direct contracting based on the intergovernmental agreement between the Government of the Republic of Serbia and the Government of the People’s Republic of China.
The project is of priority importance for the Republic of Serbia, as the section from Novi Beograd to Surčin serves as a connection between the city of Belgrade and the E-763 highway ("Miloš Veliki"), thereby creating a functional whole between the city’s road network and the E-763 highway, which represents the shortest route from Belgrade to the Adriatic Sea
The section Novi Beograd – Surčin was opened to traffic on April 1, 2023. The period for remedying the deficiencies listed in the snag list provided by the Engineer is currently in progress. Negotiations are currently underway regarding the execution of additional works related to the connection of the extension of Jurija Gagarina Street to the highway. The specified amendment shall be incorporated in a forthcoming Annex 6 to the Commercial Contract, which will, inter alia, define the contract value for the works and the timeframe for their completion.
USD 73,8 million
Start in 2021
RS budget
The state road segment Novi Beograd to Surčin, situated on the left bank of the Sava River, extends approximately 7.9 km in length. It is designed for a design speed of 80 km/h, with gentle longitudinal gradients. The cross-section of the state road ranges in width from 30.7 m to 38.20 m. It is designed with two carriageways, each consisting of three traffic lanes, a central median strip, shoulders on both sides, edge greenery, pedestrian sidewalks, and on one section, two-way bicycle lanes.
For traffic connections with the newly designed roads, in addition to the roundabout at the beginning of the route, three more at-grade intersections and a grade-separated “half-cloverleaf” interchange are planned, connecting to the street leading to the Surčin settlement and the Sava River bank, where the national stadium is planned. Three bridges and three overpasses are planned for crossing watercourses and local roads. Stormwater runoff from the roadway is planned to be managed via a controlled closed drainage system, including treatment before being discharged into receiving bodies, specifically melioration canals.